CCE 5036 Project Controls In Construction (3)


Construction Cost Estimating, Work Breakdown Structure, And Cost Control; Critical Path Method (cpm) Scheduling, Resource-constrained Scheduling, And Integral Scheduling - Cost Control; Probabilistic Scheduling Techniques, And Linear Scheduling Techniques; Contract Specifications, And Contract Claims (schedule Impact) Analysis.
Prerequisite: EGN 3443 , CCE 4004 .