|
Dec 26, 2024
|
|
|
|
CCE 5036 Project Controls In Construction (3) Construction Cost Estimating, Work Breakdown Structure, And Cost Control; Critical Path Method (cpm) Scheduling, Resource-constrained Scheduling, And Integral Scheduling - Cost Control; Probabilistic Scheduling Techniques, And Linear Scheduling Techniques; Contract Specifications, And Contract Claims (schedule Impact) Analysis. Prerequisite: EGN 3443 , CCE 4004 .
Add to Portfolio (opens a new window)
|
|