Dec 22, 2024  
2015-2016 General Catalog 
    
2015-2016 General Catalog [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

CCE 5036 Project Controls In Construction (3)


Prerequisite: EGN 3443 , CCE 4004 . Construction Cost Estimating, Work Breakdown Structure, And Cost Control; Critical Path Method (cpm) Scheduling, Resource-constrained Scheduling, And Integral Scheduling - Cost Control; Probabilistic Scheduling Techniques, And Linear Scheduling Techniques; Contract Specifications, And Contract Claims (schedule Impact) Analysis.



Add to Portfolio (opens a new window)